Comparison of Fuzzy AHP and Fuzzy TOPSIS for Road Pavement Maintenance Prioritization: Methodological Exposition and Case Study
نویسندگان
چکیده
منابع مشابه
some properties of fuzzy hilbert spaces and norm of operators
in this thesis, at first we investigate the bounded inverse theorem on fuzzy normed linear spaces and study the set of all compact operators on these spaces. then we introduce the notions of fuzzy boundedness and investigate a new norm operators and the relationship between continuity and boundedness. and, we show that the space of all fuzzy bounded operators is complete. finally, we define...
15 صفحه اولtechnical and legal parameters for determination of river boundary,( case study haraz river)
چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...
15 صفحه اولFuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
Failure mode and effects analysis (FMEA) is a widely used engineering technique for designing, identifying and eliminating known and/or potential failures, problems, errors and so on from system, design, process, and/or service before they reach the customer (Stamatis, 1995). In a typical FMEA, for each failure modes, three risk factors; severity (S), occurrence (O), and detectability (D) are e...
متن کاملProject Selection by Using Fuzzy AHP and TOPSIS Technique
In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...
متن کاملPavement rehabilitation and maintenance prioritization of urban roads using fuzzy logic
With regard to limits in budget, inevitably, one must choose prioritized projects in pavements rehabilitation and maintenance process. This paper looks into prioritization based upon a model including all effects of important factors like pavement condition index, traffic volume, road width as well as rehabilitation and maintenance cost. Since defining a model that introduces all those factors ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Civil Engineering
سال: 2015
ISSN: 1687-8086,1687-8094
DOI: 10.1155/2015/140189