Respiratory Risks in Tunnel Construction Workers

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Increase in interleukin-6 and fibrinogen after exposure to dust in tunnel construction workers.

OBJECTIVES To see if there is any change in blood concentrations of interleukin-6 (IL-6) and fibrinogen during a working shift in tunnel construction workers. METHODS 12 Tunnel construction workers were followed up during a 24 hours period after returning from a 9 day work free period. The first blood sample was taken on Monday afternoon before starting the shift. Another was taken around mid...

متن کامل

Evaluation of respiratory system in textile-dyeing workers

  Background :Despite the presence of many textile and dyeing plants in Iran, we couldn’t find similar studies in this country. Forthermore, considering progress in the dyeing process and engineering controls, assessment of respiratory system is important for these workers. The present study was performed to evaluate the respiratory system in dyeing workers.   Methods : In a cross-sectional stu...

متن کامل

Cumulative exposure to dust and gases as determinants of lung function decline in tunnel construction workers.

AIMS To study the relation between lung function decrease and cumulative exposure to dust and gases in tunnel construction workers. METHODS A total of 651 male construction workers (drill and blast workers, tunnel concrete workers, shotcreting operators, and tunnel boring machine workers) were followed up by spirometric measurements in 1989-2002 for an average of six years. Outdoor concrete w...

متن کامل

Mortality among migrant tunnel workers.

To clarify the mortality pattern of migrant tunnel workers, a retrospective cohort study was conducted in the southern part of Oita Prefecture, which is well known as a source area for tunnel workers. This study was made on 1,078 tunnel workers and 943 non-tunnel workers who were observed for 8 years and 6 months from January 1975 to June 1983. The overall SMR of tunnel workers was 162 which wa...

متن کامل

Tunnel boring machine positioning automation in tunnel construction

Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Immunopathology and Pharmacology

سال: 2004

ISSN: 2058-7384,2058-7384

DOI: 10.1177/03946320040170s215