β - Robust Parallel Machine Scheduling with Uncertain Durations

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling with uncertain durations: generating β-robust schedules using constraint programming

Many real-world scheduling problems are subject to change, and scheduling solutions should be robust to those changes. We consider a single-machine scheduling problem where the processing time of each activity is characterized by a normally-distributed random variable, and we attempt to minimize flowtime. We develop an initial constraint model for generating the β-robust schedule the schedule t...

متن کامل

Parallel Machine Scheduling with Uncertain Communication Delays

This paper is concerned with scheduling when the data are not fully known before the execution. In that case computing a complete schedule off-line with estimated data may lead to poor performances. Some flexibility must be added to the scheduling process. We propose to start from a partial schedule and to postpone the complete scheduling until execution, thus introducing what we call a stabili...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

Improved Local Search for Job Shop Scheduling with uncertain Durations

This paper is concerned with local search methods to solve job shop scheduling problems with uncertain durations modelled as fuzzy numbers. Based on a neighbourhood structure from the literature, a reduced set of moves and the consequent structure are defined. Theoretical results show that the proposed neighbourhood contains all the improving solutions from the original neighbourhood and provid...

متن کامل

robust simultaneous lot-sizing & scheduling model with uncertain demand

optimization models have been used to support decision making in production planning for a long time. however, several of those models are deterministic and do not address the variability that is present in some of the data. robust optimization is a methodology which can deal with the uncertainty or variability in optimization problems by computing a solution which is feasible for all possible ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Universal Journal of Industrial and Business Management

سال: 2014

ISSN: 2332-3310,2332-3329

DOI: 10.13189/ujibm.2014.020302