4D modelling using virtual collaborative planning and scheduling
نویسندگان
چکیده
During the last decades, introduction of Building Information Models (BIM) has opened new possibilities to ensure better communication and a shared understanding between stakeholders in construction projects. Similar benefits have been found 4D simulations schedule. While BIM use seen steady increase, potential not fully realised, primarily due tools supporting enabling full collaborative stakeholder involvement scheduling. The come from improving stakeholders. traditional modelling connects an existing model with schedule, move this type passive visualisation toward social co-creation enables all be involved scheduling process. This connection is further enhanced Virtual Reality (VR). Recent research shown VR enhance perception space details and, thus, project. paper maps planning method using process modelling. mapping followed by implementing virtual project system support for multi-user interactive environment. both during modelling; it improves
منابع مشابه
An Interactive Approach to Collaborative 4d Construction Planning
The use of 4D simulations within the construction field is growing, however, its application when carrying out true collaborative planning has not yet been fully realised. It is postulated that 4D models are currently utilised as a planning review tool, rather than integral to the initial construction planning process and do not fully support multidisciplinary collaborative construction plannin...
متن کاملCollaborative Construction Planning: towards 4d Visualizations Adapted to Practitioners Requirements
Managing the intervention of various actors during the construction phase is a recurrent issue in the construction sector. This is partly due to the multiplicity of stakeholders and the need to manage interfaces necessary for efficient planning and coordination of construction tasks. 4D CAD technology appears to be an innovative approach to answer such issues. It consists in combining a 3D mode...
متن کاملDynamic MLC Tracking Using 4D Lung Tumor Motion Modelling and EPID Feedback
Background: Respiratory motion causes thoracic movement and reduces targeting accuracy in radiotherapy. Objective: This study proposes an approach to generate a model to track lung tumor motion by controlling dynamic multi-leaf collimators. Material and Methods: All slices which contained tumor were contoured in the 4D-CT images for...
متن کاملCollaborative Factory Planning in the Virtual Reality
The competitive development and optimization of manufacturing systems challenge the collaboration and innovation of enterprises. Different information, thinking, and points of view have to be exchanged across engineering, decision-making, and executive levels safely and effectively. The Virtual Reality (VR) technologies provide the users advanced Human-Computer-Interfaces for designing, analyzi...
متن کاملAn investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation
This work or any party thereof has not previously been presented in any form to the University or to any other body whether for the purpose of assessment, publication or for any other purpose (unless otherwise indicated). Save for any express acknowledgments, references and/or bibliographies cited in the work, I confirm that the intellectual content of the work is the result of my own efforts a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Information Technology in Construction
سال: 2021
ISSN: ['1874-4753']
DOI: https://doi.org/10.36680/j.itcon.2021.042