89. Processor cycle time in mammography

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Reducing Processor Cycle Time Through Partitioning

The multicluster architecture that we introduce o ers a decentralized, dynamically-scheduled architecture, in which the register les, dispatch queue, and functional units of the architecture are distributed across multiple clusters, and each cluster is assigned a subset of the architectural registers. The motivation for the multicluster architecture is to reduce the clock cycle time, relative t...

متن کامل

A Processor Extension for Cycle-Accurate Real-Time Software

Certain hard real-time tasks demand precise timing of events, but the usual software solution of periodic interrupts driving a scheduler only provides precision in the millisecond range. NOP-insertion can provide higher precision, but is tedious to do manually, requires predictable instruction timing, and works best with simple algorithms. To achieve high-precision timing in software, we propos...

متن کامل

Image toggling saves time in mammography.

When two images are perfectly aligned, even subtle differences are readily detected when the images are "toggled" back and forth in the same location. However, substantial changes between two photographs can be missed if the images are misaligned ("change blindness"). Nevertheless, recent work from our lab, testing nonradiologists, suggests that toggling misaligned photographs leads to superior...

متن کامل

Fast Specification of Cycle-accurate Processor Models

This paper introduces a new specification style for processor microarchitectures. Our goal is to produce very simple, compact, but cycle-accurate descriptions, in order to enable early exploration of different microarchitectures and their performance. The key idea behind our approach is that we can derive the difficult-to-design forwarding and stall logic completely automatically. We have imple...

متن کامل

Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time

Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Japanese Journal of Radiological Technology

سال: 1994

ISSN: 0369-4305,1881-4883

DOI: 10.6009/jjrt.kj00003534571