A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

متن کامل

Multi-Objective Scheduling Problem in a Three-Stage Production System

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

متن کامل

a lagrangean relaxation- genetic algorithm heuristic for multi-product multi-stage and multi-period lot sizing problem with limited resource capacity

in this paper, a hybrid method for limited resource allocation and leveling in complex multi-stage, multi-product and multi-period production planning problems with aim of lot-size determination and total cost minimization has been proposed. this problem consists of multiple products with sequential production processes that are produced in different periods to meet the customers demand. by det...

متن کامل

Operations Sequencing for a Multi-stage Production Inventory System

This paper studies operations sequencing for a multi-stage production inventory system with lead times under predictable (deterministic) yield losses in the presence of uncertain demand, with full or partial release of work-in-process (WIP) inventories, for preor post-operation cost structures, and under the total discounted or average cost criteria. We derive necessary and sufficient criteria ...

متن کامل

A Polynomial Algorithm for the Multi-Stage Production-Capacitated Lot-Sizing Problem

The multi-stage lot-sizing problem with production capacities (MLSP-PC) deals with a supply chain that consists of a manufacturer with stationary production capacity and intermediaries (distribution centers or wholesalers) and a retailer to face deterministic demand. An optimal supply chain plan for the MLSP-PC specifies when and how many units each organization of the supply chain has to produ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematics of Operations Research

سال: 1986

ISSN: 0364-765X,1526-5471

DOI: 10.1287/moor.11.4.699