A Bi-objective efficiency-fairness model for scheduling slots at congested airports
نویسندگان
چکیده
منابع مشابه
Optimization of Taxiway Traversal at Congested Airports
Airport runways and taxiways have been identified as a key source of system-wide congestion and delay in the over-strained commercial air traffic system. To combat this growing problem, we present a novel approach for taxiway scheduling and traversal. Aircraft must traverse a taxiway, represented by a graph, from gates to their respective runways and arrive at their scheduled times while adheri...
متن کاملa bi-objective model for a flowshop scheduling problem with availability constraint of machines
this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...
متن کاملA Bi-objective Optimization for Vendor Managed Inventory Model
Vendor managed inventory is a continuous replenishment program that is designed to provide major cost saving benefits for both vendors and retailers. Previous research on this area mainly included single objective optimization models where the objective is to minimize the total supply chain costs or to maximize the total supply chain benefits. This paper presents a bi-objective mathematical mod...
متن کاملA Fuzzy Bi-Objective Mathematical Model for Sustainable Hazmat Transportation
Today, transportation of hazardous materials (i.e., hazmat) is a very important issue for researchers due to the risk of this transit, which should be considered for development of industries and transportation. Therefore, a model that is useful should consider the risk and damage to humanitarian and environmental issues due to transit of hazmat materials. By considering the related cost, the r...
متن کاملA HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transportation Research Part C: Emerging Technologies
سال: 2019
ISSN: 0968-090X
DOI: 10.1016/j.trc.2019.01.023