A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets

نویسندگان

چکیده

Numerous constraints affect construction projects, and lack of management may lead to schedule deviation. In the execution phase project, due timely access required resources existence uncertainty, project activities do not progress following schedule, as a result, deviation occurs. The scheduling addresses resource by critical chain method deals with delays in placing buffers that have emerged for projects. This paper presents new bi-objective mathematical model which aims reduce delay increase quality, based on constraint proposed model, been considered multi-mode ones. Moreover, this has assumed each activity be executed normal or crashing way. Due uncertainty real-world problems, duration is expressed using triangular interval-valued fuzzy numbers. A solution process presented two-step approach. First, equivalent crisp given; then second step, goal programming approach applied transforming into single-objective one. Finally, implemented case study adapted from literature, sensitivity analysis results conducted.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A bi-level linear multi-objective decision making model with interval coefficients for supply chain coordination

Abstract: Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problem...

متن کامل

A BI-LEVEL LINEAR MULTI-OBJECTIVE DECISION MAKING MODEL WITH INTERVAL COEFFICIENTS FOR SUPPLY CHAIN COORDINATION

  Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problems are co...

متن کامل

INTERVAL-VALUED FUZZY m-SEMIOPEN SETS AND INTERVAL-VALUED FUZZY m-PREOPEN SETS ON INTERVAL-VALUED FUZZY MINIMAL SPACES

We introduce the concepts of IVF m-semiopen sets, IVF m-preopen sets, IVF m-semicontinuous mappings and IVF mprecontinuous mappings on interval-valued fuzzy minimal spaces. We investigate characterizations of IVF m-semicontinuous mappings and IVF m-precontinuous mappings and study properties of IVF m-semiopen sets and IVF m-preopen sets.

متن کامل

Developing Fuzzy TOPSIS Method based on Interval-valued Fuzzy Sets

Ranking competing alternatives in terms of their overall performance with respect to some criterions in fuzzy environment is possible by the use of fuzzy TOPSIS methodology using interval-valued fuzzy-sets concepts. This author presents an effective fuzzy multi-criteria method based upon the fuzzy model and the concepts of positive ideal and negative ideal solution points for prioritizing alter...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2022

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings12070904