A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking

This work addresses the minimization of the makespan criterion for the flowshop scheduling problem with blocking. In this environment there are no buffers between successive machines, and therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. We propose a lower bound which exploits the occurrence of blocking. A branch-and-bound algorithm that uses...

متن کامل

A branch and bound method for the job-shop problem with sequence-dependent setup times

This paper deals with the job-shop scheduling problem with sequence-dependent setup times. We propose a new method to solve the makespan minimization problem to optimality. The method is based on iterative solving via branch and bound decisional versions of the problem. At each node of the branch and bound tree, constraint propagation algorithms adapted to setup times are performed for domain f...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem

This paper deals with the permutation flow shop scheduling problem. The objective is to minimize the maximum completion time, or makespan. To solve this problem which has been proved to be strongly NP-hard, a combination between an ant colony algorithm, a heuristic algorithm and a local search procedure is proposed and presented. The hybrid approach is to use artificial ants to construct soluti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Cogent Engineering

سال: 2017

ISSN: 2331-1916

DOI: 10.1080/23311916.2017.1389638