A closed loop Stackelberg game in multi-product supply chain considering information security: A case study

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new multi-product closed-loop supply chain network design in dairy industry

Nowadays, manufacturers need to satisfy consumer demands in order to compete in the real world. This requires the efficient operation of supply chain planning. On the other hand, increasing worldwide environmental, lack of food resources and social concerns are motivating manufacturers and consumers to implement recycling strategies such as product recovery, waste management, or usage of recycl...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

optimization of closed-loop supply chain, multi-level , multi-product , multi -period to reduce costs in supply chain

today, due to the direct and reverse logistics plays an important role in reducing the costs in supply chain. in this paper, in order to provide a closed-loop supply chain network including supply centers, production, distribution, collection, recycling and disposal of a used linear mixed integer programming. this paper to consider multi-period and multi-product in multi-level supply chain and ...

متن کامل

Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition

In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...

متن کامل

Optimizing a multi-product closed-loop supply chain using NSGA-II, MOSA, and MOPSO meta-heuristic algorithms

This study aims to discuss the solution methodology for a closed-loop supply chain (CLSC) network that includes the collection of used products as well as distribution of the new products. This supply chain is presented on behalf of the problems that can be solved by the proposed meta-heuristic algorithms. A mathematical model is designed for a CLSC that involves three objective functions of ma...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Production Engineering & Management

سال: 2020

ISSN: 1854-6250,1855-6531

DOI: 10.14743/apem2020.2.361