A contingency-aware method for N-2 security-constrained transmission expansion planning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stochastic Security Constrained Transmission and Battery Expansion Planning In Integrated Gas-Electricity Systems Considering High Penetration of Renewable Resources..

In this study, a new model is proposed to solve the problem of transmission and battery expansion planning considering integrated electricity and gas systems. The presented model is a bi-level stochastic planning model, where transmission and battery expansion planning modeling is done on one level, and gas network modeling is done on the other level. Here, the impact of the high penetration of...

متن کامل

solution of security constrained unit commitment problem by a new multi-objective optimization method

چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

A MULTISTAGE EXPANSION PLANNING METHOD FOR OPTIMAL SUBSTATION PLACEMENT

Optimal distribution substation placement is one of the major components of optimal distribution system planning projects. In this paper optimal substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This procedure gives the optimal size, site and installation time of medium voltage substation, using their relate...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Modern Power Systems and Clean Energy

سال: 2019

ISSN: 2196-5625,2196-5420

DOI: 10.1007/s40565-019-00570-6