A CONVEX STOCHASTIC OPTIMIZATION PROBLEM ARISING FROM PORTFOLIO SELECTION

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Convex Stochastic Optimization Problem Arising from Portfolio Selection

A continuous-time financial portfolio selection model with expected utility maximization typically boils down to solving a (static) convex stochastic optimization problem in terms of the terminal wealth, with a budget constraint. In literature the latter is solved by assuming a priori that the problem is well-posed (i.e., the supremum value is finite) and a Lagrange multiplier exists (and as a ...

متن کامل

A global optimization problem in portfolio selection

This paper deals with the issue of buy-in thresholds in portfolio optimization using the Markowitz approach. Optimal values of invested fractions calculated using, for instance, the classical minimum-risk problem can be unsatisfactory in practice because they imply that very small amounts of certain assets are purchased. Realistically, we want to impose a discrete restriction on each invested f...

متن کامل

Stochastic Optimization for Portfolio Selection Problem with Mean Absolute Negative Deviation Measure

Problem statement: The most important character within optimization problem is the uncertainty of the future returns. Approach: To handle such problems, we utilized probabilistic methods alongside with optimization techniques. We developed single stage and two stage stochastic programming with recourse. The models were developed for risk adverse investors and the objective of the stochastic pro...

متن کامل

Stochastic Linear Quadratic Portfolio Selection Problem for Relative Return Process

Stochastic linear quadratic portfolio selection problem for relative return process is to maximize the expected linear quadratic function of the relative return process. We introduce the benchmark process and define the relative return process as quotient which is obtained when the wealth process is divided by the benchmark process. We derive the optimal portfolio in closed form via investigati...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Finance

سال: 2007

ISSN: 0960-1627

DOI: 10.1111/j.1467-9965.2007.00327.x