A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint
نویسندگان
چکیده
منابع مشابه
A Mathematical Optimization Model for Solving Minimum Ordering Problem with Constraint Analysis and some Generalizations
In this paper, a mathematical method is proposed to formulate a generalized ordering problem. This model is formed as a linear optimization model in which some variables are binary. The constraints of the problem have been analyzed with the emphasis on the assessment of their importance in the formulation. On the one hand, these constraints enforce conditions on an arbitrary subgraph and then g...
متن کاملA fuzzy multi-objective model for a project management problem
In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملa mathematical optimization model for solving minimum ordering problem with constraint analysis and some generalizations
in this paper, a mathematical method is proposed to formulate a generalized ordering problem. this model is formed as a linear optimization model in which some variables are binary. the constraints of the problem have been analyzed with the emphasis on the assessment of their importance in the formulation. on the one hand, these constraints enforce conditions on an arbitrary subgraph and then g...
متن کاملA Continuous Optimization Model for Partial Digest Problem
The pupose of this paper is modeling of Partial Digest Problem (PDP) as a mathematical programming problem. In this paper we present a new viewpoint of PDP. We formulate the PDP as a continuous optimization problem and develope a method to solve this problem. Finally we constract a linear programming model for the problem with an additional constraint. This later model can be solved by the simp...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Dynamics in Nature and Society
سال: 2016
ISSN: 1026-0226,1607-887X
DOI: 10.1155/2016/1514959