A Critical Design Structure Method for Project Schedule Development under Rework Risks

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

An algebraic approach to project schedule development under precedence constraints

An approach to schedule development in project management is developed within the framework of idempotent algebra. The approach offers a way to represent precedence relationships among activities in projects as linear vector equations in terms of an idempotent semiring. As a result, many issues in project scheduling reduce to solving computational problems in the idempotent algebra setting, inc...

متن کامل

The Impact of Design Rework on Construction Project Performance

Rework in construction development projects can significantly degrade project cost and schedule performance. In a typical construction development project which involves design and construction, rework in the construction phase could increase construction cost by 10%-15% of the contract price (Burati. 1992, Josephson & Hammerlund 1999, Love & Li 2000). The proportion of money and time spent on ...

متن کامل

Evaluation Method for Enterprises’ EPR Project Risks

This paper explains the studies of recent years on development of EPR system and the project risk and then illustrates respectively the external risks and internal risks of EPR project based on the theory. Taking the EPR project of G company the author actually took part in as an example, the author firstly applies fuzzy evaluating method to evaluate project risks and draw a clear distinction b...

متن کامل

a two-objective robust optimization model for project risks response selection and explanation solution method

risk management is one of the most important aspects of project management that identifies, assesses and responds to project risks. although many papers have been published in project risk response, presented tools and methods are poor. hence, in this paper, we present an optimization model to respond project risk that seeks to optimize two key criteria of project: cost and time. the proposed m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2019

ISSN: 2071-1050

DOI: 10.3390/su11247229