A Discrete Artificial Bee Colony Algorithm for the Energy-Efficient No-Wait Flowshop Scheduling Problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An improved artificial bee colony algorithm for the blocking flowshop scheduling problem

This paper presents an improved artificial bee colony (IABC) algorithm for solving the blocking flowshop problem with the objective of minimizing makespan. The proposed IABC algorithm utilizes discrete job permutations to represent solutions and applies insert and swap operators to generate new solutions for the employed and onlooker bees. The differential evolution algorithm is employed to obt...

متن کامل

A Discrete Artificial Bee Colony Algorithm for TSP Problem

In this paper, a new discrete artificial bee colony algorithm is used to solve the symmetric traveling salesman problem (TSP). The concept of Swap Operator has been introduced to the original artificial bee colony (ABC) algorithm which can help the bees to generate a better candidate tour by greedy selection. By taken six typical TSP instances as examples, the proposed algorithm is compared wit...

متن کامل

A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem

In this paper, a discrete artificial bee colony (DABC) algorithm is proposed to solve the lotstreaming flow shop scheduling problem with the criterion of total weighted earliness and tardiness penalties under both the idling and no-idling cases. Unlike the original ABC algorithm, the proposed DABC algorithm represents a food source as a discrete job permutation and applies discrete operators to...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Manufacturing

سال: 2019

ISSN: 2351-9789

DOI: 10.1016/j.promfg.2020.01.347