A Flexible Decision Method for Transmission System Expansion Planning Considering Power Interruption Cost

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

Impact of Demand Response Technique on Hybrid Transmission expansion planning and Reactive Power planning

In this paper, a model for hybrid transmission expansion planning (TEP) and reactive power planning (RPP) considering demand response (DR) model has been presented. In this study RPP considered by TEP for its effects on lines capacity and reduction of system expansion costs. On the other hand the expansion of the transmission system is an important subject, especially dealing with the new i...

متن کامل

A Probabilistic Approach to Transmission Expansion Planning in Deregulated Power Systems under Uncertainties

Restructuring of power system has faced this industry with numerous uncertainties. As a result, transmission expansion planning (TEP) like many other problems has become a very challenging problem in such systems. Due to these changes, various approaches have been proposed for TEP in the new environment. In this paper a new algorithm for TEP is presented. The method is based on probabilisti...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEJ Transactions on Power and Energy

سال: 1995

ISSN: 0385-4213,1348-8147

DOI: 10.1541/ieejpes1990.115.12_1426