A Float-Path Theory and Its Application to the Time-Cost Tradeoff Problem
نویسندگان
چکیده
منابع مشابه
A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملThe stochastic time-cost tradeoff problem: A robust optimization approach
We consider the problem of allocating resources to projects performed under given due dates and stochastic time–cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as “robust optimization” to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original d...
متن کاملconstruction and validation of translation metacognitive strategy questionnaire and its application to translation quality
like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...
Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملa new mathematical approach based on conic quadratic programming for the stochastic time-cost tradeoff problem in project management
in this paper, we consider a stochastic time-cost tradeoff problem (tctp) in pert networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. the aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Mathematics
سال: 2015
ISSN: 1110-757X,1687-0042
DOI: 10.1155/2015/539374