A Fuzzy-Logic based Resource Levelling Optimisation Tool
نویسندگان
چکیده
منابع مشابه
Optimisation of Construction Resource Allocation and Levelling Using Genetic Algorithm
Resource allocation and levelling is one of the top challenges in construction project management, due to complex nature of the construction projects.CPM and PERT is most commonly used methods for scheduling of construction projects. However it is not capable of minimising undesirable fluctuations in resource utilisation profile. This research describes a Genetic algorithm approach to resource ...
متن کاملA fuzzy logic-based clustering algorithm for network optimisation
Rate of occurrence of high-dimensional data is much higher and sad to relate, classical clustering techniques do not hold good for such high-dimensional networks of arbitrary shapes in the underwater wireless sensor network. This is mainly due to the fact that clustering techniques are highly parameterised. Data aggregation using traditional clustering techniques is a problem for high-dimension...
متن کاملa new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot
abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...
15 صفحه اولVHDL-AMS based genetic optimisation of fuzzy logic controllers
Purpose – This paper presents a VHDL-AMS based genetic optimisation methodology for fuzzy logic controllers (FLCs) used in complex automotive systems and modelled in mixed physical domains. A case study applying this novel method to an active suspension system has been investigated to obtain a new type of fuzzy logic membership function with irregular shapes optimised for best performance. Desi...
متن کاملBuilding a fuzzy logic based tool for e-readiness measurement
Firstly, this paper presents fuzzy logic based approaches for building a tool for measuring ereadiness of a country. This paper proposes fuzzy logic for realizing the measuring tool as fuzzy logic allows processing of heterogeneous indicators and imprecise values assigned for them. The tool is constructed by using one or more fuzzy logic based inference engines. Secondly, due to the problems in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2015
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2015.06.371