A game theory perspective on product development project charters: the project manager - project sponsor relationship as an iterated Prisoner's Dilemma

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identifying and evaluating individual factors of project manager contributing to project success in project-based organizations

In recent years, The importance key success factors  has led organizations to focus more on these factors. project management is one of the factors greatly affecting project success. Having a qualified and competent project manager is the first step to actual project success. In this study, the individual factors and important competencies of the project manager have been investigated. The sta...

متن کامل

Project Manager Assignment: A Strategic Perspective

As projects are important to business success and the success or failure of a project partly depends on who manages it, assigning a project to a project manager is therefore among the strategic decisions in project management. Despite its importance, literature on project manager assignment is rather limited. In practice, with the resource constraints faced by a typical organization, making app...

متن کامل

The AI Project Manager

Figure 1: An augmentation tool to the human project manager is delivered via a user interface and is powered by machine learning. Once a project manager logs in to the system they get predictions 4 weeks out about different projects for which they are responsible. After selecting the project “UI Project”, the user can see “alerts” based on the predictions generated by a deployed machine learnin...

متن کامل

A Project Scheduling Method Based on Fuzzy Theory

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

متن کامل

EPRI Project Manager

EPRI ORDERING INFORMATION The North American power grid faces many challenges that it was not designed and engineered to handle. Congestion and atypical power flows threaten to overwhelm the system, while demand increases for higher reliability and—since September 11, 2001—better protection. The potential ramifications of grid failures have never been greater, as transport, communications, fina...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Project Organisation and Management

سال: 2017

ISSN: 1740-2891,1740-2905

DOI: 10.1504/ijpom.2017.083115