A Genetic Algorithm to Minimize the Total Tardiness for M-Machine Permutation Flowshop Problems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling a variant of flowshop problems to minimize total tardiness

This paper studies no-wait flowshop scheduling problems to minimize total tardiness. This paper mathematically formulates the problem as an effective mixed integer linear programming model. Moreover, this paper proposes solution methods based on variable neighborhood search and simulated annealing algorithms. Besides, some well-known heuristics of classical flow shops are adapted to the case of...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Gene algorithm for generalized tardiness flowshop problems

In this paper a generalized version of the tardiness flowshop permutation scheduling problems is considered. A mathematical programming formulation, in the form of a combinatorial optimization model, is also developed. Then a genetic algorithm is developed for solving the proposed problem. The efficiency of the developed algorithm is evaluated through a computational experiment, in which severa...

متن کامل

Bounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness

We consider the problem of n-jobs scheduling in an m-machine permutation flowshop with exact time lags between consecutive operations of each job. The exact time lag is defined as the time elapsed between every couple of successive operations of the same job which is equal to a prescribed value. The aim is to find a feasible schedule that minimizes the total tardiness and earliness. We propose ...

متن کامل

An improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine

In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Entrepreneurship, Management and Innovation

سال: 2012

ISSN: 2299-7075,2299-7326

DOI: 10.7341/2012822