A Group-based Multiple Assessment Strategy for Construction-related Subjects

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessment of distance-based multi-attribute group decision-making methods from a maintenance strategy perspective

Maintenance has been acknowledged by industrial management as a significant influencing factor of plant performance. Effective plant maintenance can be realized by developing a proper maintenance strategy. However, selecting an appropriate maintenance strategy is difficult because maintenance is a non-repetitive task such as production activity. Maintenance also does not leave a consistent trac...

متن کامل

construction and validation of a computerized adaptive translation test (a receptive based study)

آزمون انطباقی رایانه ای (cat) روشی نوین برای سنجش سطح علمی دانش آموزان می باشد. در حقیقت آزمون های رایانه ای با سرعت بالایی به سمت و سوی جایگزین عملی برای آزمون های کاغذی می روند (کینگزبری، هاوسر، 1993). مقاله حاضر به دنبال آزمون انطباقی رایانه ای برای ترجمه می باشد. بدین منظور دو پرسشنامه مشتمل بر 55 تست ترجمه میان 102 آزمودنی و 10 مدرس زبان انگلیسی پخش گردید. پرسشنامه اول میان 102 دانشجوی س...

A Study of Reading Strategies Using Task-Based Strategy Assessment*

In the present study, an exploratory approach (Oxford, Cho, Leung & Kim, 2004) to language learning is adopted which holds that the number and type of strategies used by Iranian learners might vary with respect to the difficulty of task and their L2 proficiency. In this regard, the term task is defined, its leading dimentions and charecteristics are put forward, and the nature of learning start...

متن کامل

A Region-Based Strategy for Collaborative Roadmap Construction

Motion planning has seen much attention over the past two decades. A great deal of progress has been made in sampling-based planning, whereby a planner builds an approximate representation of the planning space. While these planners have demonstrated success in many scenarios, there are still difficult problems where they lack robustness or efficiency, e.g., certain types of narrow spaces. Conv...

متن کامل

Evaluating Construction Projects by a New Group Decision-Making Model Based on Intuitionistic Fuzzy Logic Concepts

Select an appropriate project is a main key for contractors to increase their profits. In practice, in this area the uncertainty and imprecise of the involved parameters is so high. Therefore, considering fuzzy sets theory to deal with uncertainly is more appreciate. The aim of this paper is present a multi-criteria group decision-making model under an intuitionistic fuzzy set environment. Henc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal for Education in the Built Environment

سال: 2008

ISSN: 1747-4205

DOI: 10.11120/jebe.2008.03020046