A knowledge-based expert system to assess power plant project cost overrun risks

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The STREAMES Project: Linking Heuristic And Empirical Knowledge Into An Expert System To Assess Stream Managers

The increase in stream nutrient loads from anthropogenic sources has become a serious problem, especially in developed regions. Humans affect streams by modifying the landscape in ways that increase the transport of nutrients to surface waters, by directly dumping urban or industrial sewage into the stream, or by modifying streams in ways that reduce their ability to respond to increased nutrie...

متن کامل

Knowledge based expert system to assess fires and pollution due to fires in underground coal

A considerable amount of coal is lost due to the fires in underground/surface mines and it pollutes the natural environment because of the evolution of the pollutant gases like carbon monoxide, oxides of sulphur and nitrous fumes besides the unburnt hydrocarbons. Subsoil water loss in the area are severely damaging the strata. The movement of water overfire areas createfurther problems of low d...

متن کامل

Project Cost Overrun Simulation in Software Product Line Development

The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned ...

متن کامل

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Expert Systems with Applications

سال: 2019

ISSN: 0957-4174

DOI: 10.1016/j.eswa.2019.06.030