A mathematical model for the design of distributed layout by considering production planning and system reconfiguration over multiple time periods
نویسندگان
چکیده
منابع مشابه
investigating the feasibility of a proposed model for geometric design of deployable arch structures
deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...
Design of a New Mathematical Model for Integrated Dynamic Cellular Manufacturing Systems and Production Planning
This paper presents a new mathematical model for integrated dynamic cellular manufacturing systems and production planning that minimizes machine purchasing, intra-cell material handling, cell reconfiguration and setup costs. The presented model forms the manufacturing cells and determines the quantity of machine and movements during each period of time. This problem is NP-hard, so a meta-heur...
متن کاملA Mathematical Model for Multiple-Load AGVs in Tandem Layout
Reducing cost of material handling has been a big challenge for companies. Flexible manufacturing system employed automated guided vehicles (AGV) to maintain efficiency and flexibility. This paper presents a new non-linear mathematical programming model to group n machines into N loops, to make an efficient configuration for AGV system in Tandem layout. The model minimizes bot...
متن کاملA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial Engineering International
سال: 2015
ISSN: 1735-5702,2251-712X
DOI: 10.1007/s40092-015-0102-1