A mathematical model for the design of distributed layout by considering production planning and system reconfiguration over multiple time periods

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

investigating the feasibility of a proposed model for geometric design of deployable arch structures

deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...

Design of a New Mathematical Model for Integrated Dynamic Cellular Manufacturing Systems and Production Planning

This paper presents a new mathematical model for integrated dynamic cellular manufacturing systems and production planning that minimizes machine purchasing, intra-cell material handling, cell reconfiguration and setup costs. The presented model forms the manufacturing cells and determines the quantity of machine and movements  during each period of time. This problem is NP-hard, so a meta-heur...

متن کامل

A Mathematical Model for Multiple-Load AGVs in Tandem Layout

Reducing cost of material handling has been a big challenge for companies. Flexible manufacturing system employed automated guided vehicles (AGV) to maintain efficiency and flexibility. This paper presents a new non-linear mathematical programming model to group n machines into N loops, to make an efficient configuration for AGV system in Tandem layout. The model minimizes bot...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Engineering International

سال: 2015

ISSN: 1735-5702,2251-712X

DOI: 10.1007/s40092-015-0102-1