A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach
نویسندگان
چکیده
This meta-analysis has examined the past ten years’ studies concerning causes of construction project delay. It aims to update subject area and investigate critical delay in three different conditions external environment. The data from 50 have been analyzed synthesized determine top Relative Importance Index (RII) technique was applied rank causes; subsequently, Spearman’s correlation coefficient calculated evaluate causes. review findings indicate substantial differences between defined situations. developed countries root project’s internal leading delays developing are task While with various constraints high risk, general environment a impact alongside on time overrun project. Moreover, this summarized categorized best available propose systematic approach identifying bridge existing knowledge gap.
منابع مشابه
a phonological contrastive analysis of kurdish and english
deposite the different criticisms on contrastive analysis it has been proved that the results of it(when processed)can be usuful in a tefl environment,specially at the level of phonology.this study is an attempt to compare and contrast the sound systems of kurdish and english for pedagogical aims. the consonants,vowels,stress and intonation of the twolanguages are described by the same model-ta...
15 صفحه اولa comparative analysis of the marginal microleakages of two pit and fissure sealans, conseal-f and conseal clear
چکیده ندارد.
15 صفحه اولa comparative pragmatic analysis of the speech act of “disagreement” across english and persian
the speech act of disagreement has been one of the speech acts that has received the least attention in the field of pragmatics. this study investigates the ways power relations, social distance, formality of the context, gender, and language proficiency (for efl learners) influence disagreement and politeness strategies. the participants of the study were 200 male and female native persian s...
15 صفحه اولa contrastive analysis of concord and head parameter in english and azerbaijani
این پایان نامه به بررسی و مقایسه دو موضوع مطابقه میان فعل و فاعل (از نظر شخص و مشار) و هسته عبارت در دو زبان انگلیسی و آذربایجانی می پردازد. اول رابطه دستوری مطابقه مورد بررسی قرار می گیرد. مطابقه به این معناست که فعل مفرد به همراه فاعل مفرد و فعل جمع به همراه فاعل جمع می آید. در انگلیسی تمام افعال، بجز فعل بودن (to be) از نظر شمار با فاعلشان فقط در سوم شخص مفرد و در زمان حال مطابقت نشان میدهند...
15 صفحه اولthe use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach
abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Canadian Journal of Civil Engineering
سال: 2021
ISSN: ['1208-6029', '0315-1468']
DOI: https://doi.org/10.1139/cjce-2020-0527