A MILP-based restoration planning method for generator start-up considering flexible re-energizing times of transmission lines

نویسندگان

چکیده

During power system restoration, the planning of generator start-up sequence (GSUS) can significantly affect restoration efficiency. However, a GSUS optimization model based on mixed integer linear programming (MILP) cannot satisfy need for flexible re-energizing times transmission lines and serial generators. To solve this issue, new MILP-based is proposed in paper that generate scheme with lines. The requirements generators are formulated as time constraints lines, buses paths, constraint, which transformed into by means auxiliary binary (0–1) decision variables. Meanwhile, restart transient frequency modeled constraints. Finally, performance method verified IEEE 39-bus system.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Transmission expansion planning based on merchandizing surplus of transmission lines

This paper proposes an optimal transmission expansion planning (TEP) which is based on determining share of each line in merchandizing surplus (MS) of system, determining by Independent System Operator (ISO). The more share of a line in MS of system denotes the priority of a line for expansion. The procedure of determining MS of each line in a power system is based on determining the MS share o...

متن کامل

transmission expansion planning based on merchandizing surplus of transmission lines

this paper proposes an optimal transmission expansion planning (tep) which is based on determining share of each line in merchandizing surplus (ms) of system, determining by independent system operator (iso). the more share of a line in ms of system denotes the priority of a line for expansion. the procedure of determining ms of each line in a power system is based on determining the ms share o...

متن کامل

Flexible Transmission Network Planning Considering the Impacts of Distributed Generation

The restructuring of global power industries has introduced a number of challenges, such as conflicting planning objectives and increasing uncertainties, to transmission network planners. During the recent past, a number of distributed generation technologies also reached a stage allowing large scale implementation, which will profoundly influence the power industry, as well as the practice of ...

متن کامل

Subsystem Partitioning for Power System Black-start Considering Restoration Reliability

Original scientific paper After large scale blackout, there may be more than one black-start unit in power system. A rational subsystem partitioning restoration scheme could speed up the entire system restoration procedure and promote restoration reliability. In the paper, a subsystem partitioning strategy considering the restoration reliability is proposed. The calculation of nodes restoration...

متن کامل

DCGA Based-Transmission Network Expansion Planning Considering Network Adequacy

Transmission network expansion planning (TNEP) is an important component of power system planning that its task is to minimize the network construction and operational cost while satisfying the demand increasing, imposed technical and economic conditions. Up till now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem. But in all of t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Electrical Power & Energy Systems

سال: 2021

ISSN: ['1879-3517', '0142-0615']

DOI: https://doi.org/10.1016/j.ijepes.2020.106357