A Model for Delay Analysis Impact at Planning Phase of Oil & Gas Pipeline Projects: A case of Iraq

نویسندگان

چکیده

Project delay and cost overrun are major issues caused by the associated Risk Factors (RFs) in any projects including Oil Gas Pipeline Projects (OGPPs). This problem is exacerbated subjective nature of identification quantification factors t at planning stage. To overcome above issues, this research designs a Delay Analysis Model (DAM) stage project introducing fuzzy logic analysis; hence, systematize objectify process. The paper presents step-by-step process identifying RFs quantifying probability delivery. main inputs model RFs, level impact, estimated maximum & minimum duration each task project. integrated within @Risk simulator with Monte Carlo Simulation to quantify impact projects. key output study useful analysis tool that help identify potential impacts confidence deliver time so proactive measures could be taken advance. was evaluated using case an OGPP Iraq. findings suggested overall all stages found around 45 days might occur due risk

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

esp needs analysis of iranian ma students: a case study of university of isfahan

نیاز سنجی دانشجویان کارشناسی ارشد ایرانی در رابطه با زبان تخصصی: مطالعه ای در دانشگاه اصفهان هدف از این مطالعه بررسی نیازهای یادگیری زبان خارجی دانشجویان کارشناسی ارشد دانشجویان دانشگاه اصفهان در رشته های زیست شناسی، روانشناسی، تربیت بدنی، حسابداری و فلسفه ی غرب میباشد. در مجموع 80 دانشجودر پنج رشته ی متفاوت از دانشگاه اصفهان در این پژوهش شرکت داشتند.علاوه بر این هشتاد دانشجو،25 استاد دروس ت...

15 صفحه اول

the impact of training on second language writing assessment: a case of raters’ biasedness

چکیده هدف اول این تحقیق بررسی تأثیر آموزش مصحح بر آموزش گیرندگان براساس پایایی نمره های آنها در پنج بخش شامل محتوا ، سازمان ، لغت ، زبان و مکانیک بود. هدف دوم این بود که بدانیم آیا تفاوتهای بین آموزشی گیرندگان زن و مرد در پایایی نمرات آنها وجود دارد. برای بررسی این موارد ، ما 90 دانشجو در سطح میانه (متوسط) که از طریق تست تعیین سطح شده بودند انتخاب شدند. بعد از آنها خواستیم که درباره دو موضوع ا...

15 صفحه اول

investigating the feasibility of a proposed model for geometric design of deployable arch structures

deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...

a comparison of linguistic and pragmatic knowledge: a case of iranian learners of english

در این تحقیق دانش زبانشناسی و کاربردشناسی زبان آموزان ایرانی در سطح بالای متوسط مقایسه شد. 50 دانش آموز با سابقه آموزشی مشابه از شش آموزشگاه زبان مختلف در دو آزمون دانش زبانشناسی و آزمون دانش گفتار شناسی زبان انگلیسی شرکت کردند که سوالات هر دو تست توسط محقق تهیه شده بود. همچنین در این تحقیق کارایی کتابهای آموزشی زبان در فراهم آوردن درون داد کافی برای زبان آموزان ایرانی به عنوان هدف جانبی تحقیق ...

15 صفحه اول

a study on insurer solvency by panel data model: the case of iranian insurance market

the aim of this thesis is an approach for assessing insurer’s solvency for iranian insurance companies. we use of economic data with both time series and cross-sectional variation, thus by using the panel data model will survey the insurer solvency.

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: EPiC series in built environment

سال: 2022

ISSN: ['2632-881X']

DOI: https://doi.org/10.29007/m9hk