A MULTI-PERIOD WORKER ASSIGNMENT MODEL CONSIDERING WORK ELEMENTS, SKILLS, LEARNING AND FORGETTING

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Bi-objective Model for Cellular Manufacturing System Considering Worker Skills, Part Priorities,and Equipment Levels

Here, a new mathematical model for cellular manufacturing systems considering three important features of part priority, levels of machine’s technology, and the operator’s skill is developed. Simultaneous consideration of these features provides a more realistic analysis of the problems in cellular manufacturing systems. A model with multiple design features including cell formation, human reso...

متن کامل

Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing

This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...

متن کامل

An Analytical Approach for Single and Mixed-Model Assembly Line Rebalancing and Worker Assignment Problem

In this paper, an analytical approach is used for assembly line rebalancing and worker assignment for single and mixed-model assembly lines based on a heuristic-simulation algorithm. This approach helps to managers to select a better marketing strategy when different combinations of demands are suitable.Furthermore, they can use it as a guideline to know which worker assignment is better for ea...

متن کامل

Distributed Generation Expansion Planning Considering Load Growth Uncertainty: A Novel Multi-Period Stochastic Model

Abstract – Distributed generation (DG) technology is known as an efficient solution for applying in distribution system planning (DSP) problems. Load growth uncertainty associated with distribution network is a significant source of uncertainty which highly affects optimal management of DGs. In order to handle this problem, a novel model is proposed in this paper based on DG solution, consideri...

متن کامل

A multi-product, multi-period model to select supplier for deteriorating products while considering uncertainty as well as backorder

Determining supplier and optimum order of the quantity is an issue of great importance in logistics management for many companies. In this regard, it is crucial to determine the best decisions for the order quantity as well as the most suitable supplier through considering existing limitations and uncertainties. To optimize a multi-product, multi-period model with select supplier for deteriorat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: DEStech Transactions on Engineering and Technology Research

سال: 2018

ISSN: 2475-885X

DOI: 10.12783/dtetr/icpr2017/17609