A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times
نویسندگان
چکیده
منابع مشابه
A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times
The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shortage ...
متن کاملBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملMulti-objective supply planning for two-level assembly systems with stochastic lead times
This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for invent...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial Engineering International
سال: 2013
ISSN: 1735-5702,2251-712X
DOI: 10.1186/2251-712x-9-29