A neural algorithm for a fundamental computing problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the algorithm for solving the inverse numerical range problem

برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.

15 صفحه اول

A genetic algorithm approach for problem

In this paper, a genetic algorithm is presented for an identical parallel-machine scheduling problem with family setup time that minimizes the total weighted flow time ( ). No set-up is necessary between jobs belonging to the same family. A set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i  j, the duration of this set-up being the sequ...

متن کامل

A SIMPLE ALGORITHM FOR COMPUTING TOPOLOGICAL INDICES OF DENDRIMERS

Dendritic macromolecules’ have attracted much attention as organic examples of well-defined nanostructures. These molecules are ideal model systems for studying how physical properties depend on molecular size and architecture. In this paper using a simple result, some GAP programs are prepared to compute Wiener and hyper Wiener indices of dendrimers.

متن کامل

A SIMPLE ALGORITHM FOR COMPUTING DETOUR INDEX OF NANOCLUSTERS

Let G be the chemical graph of a molecule. The matrix D = [dij ] is called the detour matrix of G, if dij is the length of longest path between atoms i and j. The sum of all entries above the main diagonal of D is called the detour index of G. In this paper, a new algorithm for computing the detour index of molecular graphs is presented. We apply our algorithm on copper and silver nanoclusters ...

متن کامل

A Genetic Algorithm Developed for a Supply Chain Scheduling Problem

This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Science

سال: 2017

ISSN: 0036-8075,1095-9203

DOI: 10.1126/science.aam9868