A New Method of Controlling Job Due Dates for Early Due Dates and Short Flow Times

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single-machine scheduling with release dates, due dates and family setup times

We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers’ satis...

متن کامل

a multi-objective model for the location routing problem with fuzzy travel times and due dates

in this study the location routing problem with fuzzy parameters is taken into account, this problem involves determining the location of the depots and routing of the vehicles in order to serve the customers. in this study a location routing problem with fuzzy travel times and due dates is considered and two objective models are proposed. the considered objectives are minimizing the total cost...

متن کامل

Adjustments of Release and Due Dates for Cumulative Scheduling Problems

This paper presents a set of satisfiability tests and time-bound adjustments that can be applied to cumulative scheduling problems. We introduce the Cumulative Scheduling Problem (CuSP), an extension of the m-machine problem in which activities, having both release and due dates, can require more than one unit of the resource. Given a CuSP instance, we present two necessary conditions for the e...

متن کامل

Input control in a batch production system with lead times, due dates and random yields

The presence of random yields in many manufacturing processes can considerably complicate production planning and control. We investigate a batch production system with due dates, where the yield of each batch is random and the production lead time is longer than the time interval between starting consecutive batches. To satisfy an order with a given due date, several input batches could be ini...

متن کامل

On two single machine scheduling problems with fuzzy processing times and fuzzy due dates

Two single machine scheduling problems with fuzzy processing times and fuzzy due dates are considered. In both we define the fuzzy tardiness of a job in a given sequence as a fuzzy maximum of zero and the difference between the fuzzy completion time and the fuzzy due date of this job. In the first problem we minimize the maximal expected value of a fuzzy tardiness and in the second we minimize ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C

سال: 1981

ISSN: 0387-5024,1884-8354

DOI: 10.1299/kikaic.47.1547