A new open-pit mine planning optimization method using block aggregation and integer programming
نویسندگان
چکیده
منابع مشابه
A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملA practical approach to open-pit mine planning under price uncertainty using information gap decision theory
In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملBlock size selection and its impact on open-pit design and mine planning
In mining projects, the design and production programmes are developed on the basis of a block model. This model requires defining, assessing and assuring many important parameters used in the feasibility study and that may have relevant consequences over the future results of the project. The selection of such parameters is a complex engineering decision due to their great economic impact on t...
متن کاملA continuous model for open pit mine planning∗
This paper proposes a new mathematical model for the open pit mine planning problem, based on continuous functional analysis. The traditional models for this problem have been constructed by using discrete 0−1 decision variables, giving rise to large-scale combinatorial and Mixed Integer Programming (MIP) problems. Instead, we use a continuous approach which allows for a refined imposition of s...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Southern African Institute of Mining and Metallurgy
سال: 2018
ISSN: 2411-9717,2225-6253
DOI: 10.17159/2411-9717/2018/v118n7a4