A New Schedule Estimation Technique for Construction Projects

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Schedule Estimation Technique for Construction Projects

Research paper Allen studied hundreds of construction projects and developed an accu-rate, practically useful model of their labor profiles. We combine Al-len’s labor profile with standard Earned Value Management (EVM) techniques and derive a simple, practical formula that estimates the fi-nal schedule from early project data. The schedule estimation formula is exact; it requires no approximati...

متن کامل

Schedule Multiple Highway Construction Projects

The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.

متن کامل

A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...

متن کامل

BIM-based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects

With the increasing popularity of Building Information Modeling (BIM), several research studies have focused on its application in the construction industry, and advancements such as developments of BIM-based tools for construction scheduling and cost estimating have been carried out. Nevertheless, these tools are each developed only for one particular aspect of construction management, such as...

متن کامل

A New Technique for Proppant Schedule Design

This study introduces a novel methodology for the design of the proppant pumping schedule for a hydraulic fracture, in which the final proppant distribution along the crack is prescribed. While the design is based on the assumption that the particles have relatively weak impact on the fracture propagation, the validity of this assumption can be tested a posteriori. This makes it possible to rel...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Organization, technology and management in construction: An international journal

سال: 2014

ISSN: 1847-5450,1847-6228

DOI: 10.5592/otmcj.2014.3.1