A new unifying heuristic algorithm for the undirected minimum cut problems using minimum range cut algorithms
نویسندگان
چکیده
منابع مشابه
Practical Minimum Cut Algorithms
The minimum cut problem for an undirected edge-weighted graph asks us to divide its set of nodes into two blocks while minimizing the weight sum of the cut edges. Here, we introduce a linear-time algorithm to compute near-minimum cuts. Our algorithm is based on cluster contraction using label propagation and Padberg and Rinaldi’s contraction heuristics [SIAM Review, 1991]. We give both sequenti...
متن کاملUnifying Maximum Cut and Minimum Cut of a Planar Graph
Absfmcf-We consider the real-weight maximum cut of a planar graph. Given an undirected planar graph with real-valued weights associated with its edges, find a partition of the vertices into two nonemply sets such that the sum of the weights of the edges connecting the two sets is maximum. The conventional maximum cut and minimum cut problems assume nonnegative edge weights, and thus are special...
متن کاملMinimum cut bases in undirected networks
Given an undirected, connected network G = (V,E) with weights on the edges, the cut basis problem is asking for a maximal number of linear independent cuts such that the sum of the cut weights is minimized. Surprisingly, this problem has not attained as much attention as its graph theoretic counterpart, the cycle basis problem. We consider two versions of the problem, the unconstrained and the ...
متن کاملNew algorithms for the Minimum Coloring Cut Problem
The Minimum Coloring Cut Problem is defined as follows: given a connected graph G with colored edges, find an edge cut E′ of G (a minimal set of edges whose removal renders the graph disconnected) such that the number of colors used by the edges in E′ is minimum. In this work, we present two approaches based on Variable Neighborhood Search to solve this problem. Our algorithms are able to find ...
متن کاملSolving Project Scheduling Problems by Minimum Cut Computations Solving Project Scheduling Problems by Minimum Cut Computations †
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in manufacturing, production planning, project management, and elsewhere. It is one of the most intractable pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Applied Mathematics
سال: 1996
ISSN: 0166-218X
DOI: 10.1016/0166-218x(95)00034-o