A Newsboy formulae to optimize planned lead times for two-level disassembly systems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective supply planning for two-level assembly systems with stochastic lead times

This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for invent...

متن کامل

a new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot

abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...

15 صفحه اول

A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount

In this paper the real-world occurrence of the multiple-product multiple-constraint single period newsboy problem with two objectives, in which there is incremental discounts on the purchasing prices, is investigated. The constraints are the warehouse capacity and the batch forms of the order placements. The first objective of this problem is to find the order quantities such that the expected ...

متن کامل

Mathematical Model for Supply Planning of Multi-Level Assembly Systems with Stochastic Lead Times

The deal for industrial companies is to satisfy their customers with the best quality, the most reliable lead times, and the lowest costs. One of the keys to achieve it is in the inventory control in the Supply Chain. Moreover, it is mandatory to possess necessary components in order to produce the requested products by the due date. But, as the components lead time is an unpredictable paramete...

متن کامل

Genetic algorithm for multi-level assembly systems under stochastic lead times

The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2020

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2020.12.2867