A Numerical Optimization Technique for Scheduling Non-uniform Metro Trains under Time-varying Passenger Demands

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

Scheduling VOQ Switches under Non-Uniform Traffic

Abstract — Input queueing is becoming increasingly important for high-bandwidth switches and routers. In previous work, we proved that it is possible to achieve 100% throughput for input-queued switches using a cell-by-cell scheduling algorithm called LQF. However, LQF is too complex to implement in hardware. In this paper we introduce a new algorithm called Longest Port First (LPF), which is d...

متن کامل

Competition under Time-Varying Demands and Dynamic Lot Sizing Costs

We develop a competitive pricing model which combines the complexity of time-varying demand and cost functions and that of scale economies arising from dynamic lot sizing costs. Each firm can replenish inventory in each of the T periods into which the planning horizon is partitioned. Fixed as well as variable procurement costs are incurred for each procurement order, along with inventory carryi...

متن کامل

Portfolio Optimization under Time-Varying Economic Regimes

Our paper aims to answer the question: Can the macroeconomic condition be used to better allocate investments among different sectors of a market? Motivated by classical Markowitz portfolio theory, and prior work in attempting to incorporate exogenous economic factors in portfolio optimization [1][2][3][4], we explore three approaches to dynamically rebalance a portfolio as market or economic r...

متن کامل

Resource Allocation for Covering Time Varying Demands

We consider the problem of allocating resources to satisfy demand requirements varying over time. The input specifies a demand for each timeslot. Each resource is specified by a start-time, end-time, an associated cost and a capacity. A feasible solution is a multiset of resources such that at any point of time, the sum of the capacities offered by the resources is at least the demand requireme...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: DEStech Transactions on Computer Science and Engineering

سال: 2017

ISSN: 2475-8841

DOI: 10.12783/dtcse/cmsam2017/16418