A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
نویسندگان
چکیده
منابع مشابه
A modified branch and bound algorithm for a vague flow-shop scheduling problem
Uncertainty plays a significant role in modeling and optimization of real world systems. Among uncertain approaches, fuzziness describes impreciseness while for ambiguity another definition is required. Vagueness is a probabilistic model of uncertainty being helpful to include ambiguity into modeling different processes especially in industrial systems. In this paper, a vague set based on dista...
متن کاملthe algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولA Branch-and-Price Algorithm for Multi-mode Resource Leveling
Resource leveling is a variant of resource-constrained project scheduling in which a non-regular objective function, the resource availability cost, is to be minimized. We present a branch-and-price approach together with a new heuristic to solve the more general turnaround scheduling problem. Besides precedence and resource constraints, also availability periods and multiple modes per job have...
متن کاملA New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time
Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...
متن کاملA branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computer-Aided Civil and Infrastructure Engineering
سال: 2016
ISSN: 1093-9687
DOI: 10.1111/mice.12233