A priority-based heuristic algorithm (PBHA) for optimizing integrated process planning and scheduling problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel Heuristic Algorithm Based on Clark and Wright Algorithm for Green Vehicle Routing Problem

A significant portion of Gross Domestic Production (GDP) in any country belongs to the transportation system. Transportation equipment, in the other hand, is supposed to be great consumer of oil products. Many attempts have been assigned to the vehicles to cut down Greenhouse Gas (GHG). In this paper a novel heuristic algorithm based on Clark and Wright Algorithm called Green Clark and Wright (...

متن کامل

An effective hybrid algorithm for integrated process planning and scheduling

Process planning and scheduling are two of the most important functions in the manufacturing system. Traditionally, process planning and scheduling were regarded as separate tasks performed sequentially, where scheduling was implemented after process plans had been generated. However, their functions are usually complementary. If the two systems can be integrated more tightly, greater performan...

متن کامل

A Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).&#10In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Cogent Engineering

سال: 2015

ISSN: 2331-1916

DOI: 10.1080/23311916.2015.1070494