A priority-based heuristic algorithm (PBHA) for optimizing integrated process planning and scheduling problem
نویسندگان
چکیده
منابع مشابه
A Novel Heuristic Algorithm Based on Clark and Wright Algorithm for Green Vehicle Routing Problem
A significant portion of Gross Domestic Production (GDP) in any country belongs to the transportation system. Transportation equipment, in the other hand, is supposed to be great consumer of oil products. Many attempts have been assigned to the vehicles to cut down Greenhouse Gas (GHG). In this paper a novel heuristic algorithm based on Clark and Wright Algorithm called Green Clark and Wright (...
متن کاملAn effective hybrid algorithm for integrated process planning and scheduling
Process planning and scheduling are two of the most important functions in the manufacturing system. Traditionally, process planning and scheduling were regarded as separate tasks performed sequentially, where scheduling was implemented after process plans had been generated. However, their functions are usually complementary. If the two systems can be integrated more tightly, greater performan...
متن کاملA Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory
We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Cogent Engineering
سال: 2015
ISSN: 2331-1916
DOI: 10.1080/23311916.2015.1070494