A Real-Time Rolling Horizon Chance Constrained Optimization Model for Energy Hub Scheduling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Decentralized chance-constrained finite-horizon

This paper considers finite-horizon optimal control for multi-agent systems subject to additive Gaussiandistributed stochastic disturbance and a chance constraint. The problem is particularly difficult when agents are coupled through a joint chance constraint, which limits the probability of constraint violation by any of the agents in the system. Although prior approaches [1][2] can solve such...

متن کامل

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Uncertain Chance-constrained Programming Model for Project Scheduling Problem

Project scheduling problem is to determine the schedule of allocating the loans to a project in order to balance the total cost and the completion time of the project under some constraints. This paper considers project scheduling problem in an uncertain environment, of which the duration time of each activity is an uncertain variable. Then uncertain chance-constrained programming model is cons...

متن کامل

A Chance Constrained Model for a Two Units Series Critical System Suffering From Continuous Deterioration

In this paper we focus on a continuously deteriorating two units series equipment which its failure can not be measured by cost criterion. For these types of systems avoiding failure during the actual operation of the system is extremely important. In this paper we determine inspection periods and maintenance policy in such a way that failure probability is limited to a pre-specified value and ...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainable Cities and Society

سال: 2020

ISSN: 2210-6707

DOI: 10.1016/j.scs.2020.102417