A research on project performance measurement by the method of earned value analysis

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Practical Software Measurement , Performance - Based Earned Value Paul

T his article discusses a set of integrated , performance measurement techniques that increased Northrop Grumman Corporation's software success. These techniques can enable excellent project management in the following ways: • Defining effective metrics for sizing the project and measuring progress. • Using Earned Value Management (EVM) as the key, integrating tool for control. • Defining quali...

متن کامل

a study on insurer solvency by panel data model: the case of iranian insurance market

the aim of this thesis is an approach for assessing insurer’s solvency for iranian insurance companies. we use of economic data with both time series and cross-sectional variation, thus by using the panel data model will survey the insurer solvency.

a comparative move analysis of the introduction sections of ma theses by iranian and native post-graduate students

since esp received universal attention to smooth the path for academic studies and productions, a great deal of research and studies have been directed towards this area. swales’ (1990) model of ra introduction move analysis has served a pioneering role of guiding many relevant studies and has proven to be productive in terms of helpful guidelines that are the outcome of voluminous productions ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Pressacademia

سال: 2021

ISSN: 2146-7943

DOI: 10.17261/pressacademia.2021.1398