A Risk-Based Interval Two-Stage Programming Model for Agricultural System Management under Uncertainty

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Planning an Agricultural Water Resources Management System: A Two-Stage Stochastic Fractional Programming Model

Irrigation water management is crucial for agricultural production and livelihood security in many regions and countries throughout the world. In this study, a two-stage stochastic fractional programming (TSFP) method is developed for planning an agricultural water resources management system under uncertainty. TSFP can provide an effective linkage between conflicting economic benefits and the ...

متن کامل

A novel risk-based analysis for the production system under epistemic uncertainty

Risk analysis of production system, while the actual and appropriate data is not available, will cause wrong system parameters prediction and wrong decision making. In uncertainty condition, there are no appropriate measures for decision making. In epistemic uncertainty, we are confronted by the lack of data. Therefore, in calculating the system risk, we encounter vagueness that we have to use ...

متن کامل

A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty

In this study, a two-stage inexact-stochastic programming (TISP) method is developed for planning carbon dioxide (CO2) emission trading under uncertainty. The developed TISP incorporates techniques of interval-parameter programming (IPP) and two-stage stochastic programming (TSP) within a general optimization framework. The TISP can not only tackle uncertainties expressed as probabilistic distr...

متن کامل

A Semi-Infinite Interval-Stochastic Risk Management Model for River Water Pollution Control under Uncertainty

In this study, a semi-infinite interval-stochastic risk management (SIRM) model is developed for river water pollution control, where various policy scenarios are explored in response to economic penalties due to randomness and functional intervals. SIRM can also control the variability of the recourse cost as well as capture the notion of risk in stochastic programming. Then, the SIRM model is...

متن کامل

A two-stage stochastic programming model for the optimal sizing of hybrid PV/diesel/battery in hybrid electric ship system

Ships play the major role in bulk transportation and they need their special energy system. This paper proposes a stochastic programing method for optimal sizing of a hybrid ship power system with energy storage system (ESS), photovoltaic power (PV) and diesel generator. To account for uncertainties, in this study a two-stage stochastic mixed-integer non-linear programing is used to model the o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2016

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2016/7438913