A scatter search algorithm for project scheduling under partially renewable resources

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A scatter search algorithm for project scheduling under partially renewable resources

In this paper we develop a heuristic algorithm, based on Scatter Search, for project scheduling problems under partially renewable resources. This new type of resource can be viewed as a generalization of renewable and non-renewable resources, and is very helpful in modelling conditions that do no fit into classical models, but which appear in real timetabling and labor scheduling problems. The...

متن کامل

Fast Iterative Improvement Methods for Project Scheduling under Partially Renewable Resources

It is well-known that for many project scheduling problems the space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find an optimal schedule. Yet, for some problems such results are not directly applicable. We address one ...

متن کامل

GRASP and path relinking for project scheduling under partially renewable resources

Recently, in the field of project scheduling problems the concept of partially renewable resources has been introduced. Theoretically, it is a generalization of both renewable and non-renewable resources. From an applied point of view, partially renewable resources allow us to model a large variety of situations that do not fit in classical models, but can be found in real problems in timetabli...

متن کامل

A hybrid scatter search/electromagnetism meta-heuristic for project scheduling

In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively small instances. In this paper, we present a new meta-heuristic for this problem, able to provide near-...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Heuristics

سال: 2006

ISSN: 1381-1231,1572-9397

DOI: 10.1007/s10732-006-5224-6