A Simulation Study Of Economic Production Quantity Lot Size To Kanban For A Single Line Production System Under Various Setup Times With Annual Setup Cost As Performance Metric
نویسندگان
چکیده
منابع مشابه
Optimal Setup Cost Reduction and Lot Sizing with Imperfect Production Processes and Quantity Discounts
متن کامل
OPTIMIZATION OF A PRODUCTION LOT SIZING PROBLEM WITH QUANTITY DISCOUNT
Dynamic lot sizing problem is one of the significant problem in industrial units and it has been considered by many researchers. Considering the quantity discount in purchasing cost is one of the important and practical assumptions in the field of inventory control models and it has been less focused in terms of stochastic version of dynamic lot sizing problem. In this paper, stochastic dyn...
متن کاملOptimal Lot Sizing and Setup Cost Reduction for Deteriorating Production System
In this paper, we extend Porteus (1986) to generalize the economic production quantity (EPQ) model with finite production rate and to derive an exact expression for the expected total annual cost function when maintenance actions and capital investment in setup cost reduction are adopted. In addition, the uniqueness property of the optimal lot size and the bounds of optimal lot size are derived...
متن کاملNew scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملA Capacitated Lot Sizing Problem with Stochastic Setup Times
In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times (CLSP-SST).We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SST is formulated as a two-stage stochastic programming problem. A procedure is proposed to effe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Management & Information Systems (IJMIS)
سال: 2011
ISSN: 2157-9628,1546-5748
DOI: 10.19030/ijmis.v15i2.4149