A Single-machine Scheduling with Generalized Due Dates to Minimize Total Weighted Late Work
نویسندگان
چکیده
In the paper, we consider a single-machine scheduling problem with generalized due dates, in which objective is to minimize total weighted work. This was proven be NP-hard by Mosheiov et al. [1]. However, exact complexity remains open. We show that strongly NP-hard, and weakly if lengths of intervals between consecutive dates are identical.
منابع مشابه
Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملSingle .machine Total Weighted Tardiness with Release Dates Single Machine Total Weighted Tardiness with Release Dates
The single machine total weighted tardiness with release dates problem is known to be strongly NP-hard. With a new lower bounding scheme and a new upper bounding scheme, we get an efficient branch and bound algorithm. In the paper, we first introduce the history of the problem and its computational complexity. Second, the lower bounding schemes and the upper bounding schemes are described in de...
متن کاملSingle Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness
This paper deals with a common due date parallel machines scheduling problem in which each job has a different tardiness penalty. The objective is to minimize the total weighted tardiness. The scheduling problem of minimizing the total weighted tardiness with a common due date on a single machine is known to be ordinary NP-hard. This is also the case for problem Pm|di = d| ∑ wiTi. A new dynamic...
متن کاملA Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Asian research journal of mathematics
سال: 2022
ISSN: ['2456-477X']
DOI: https://doi.org/10.9734/arjom/2022/v18i430368