A study exploring critical pathways in clear cell renal cell carcinoma

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A study exploring critical pathways in clear cell renal cell carcinoma

Renal cell carcinoma (RCC) is the most lethal type of cancer in the urinary system and often presents as a metastatic disease. Furthermore, there are no effective treatments for the disease. Several studies based on gene expression profiling have been performed with the aim of gaining insights into the pathogenesis of RCC; however, few studies have investigated RCC at the pathway level to searc...

متن کامل

Metastatic Renal cell Carcinoma Presenting as a clear-cell Tumor in Tongue: A Case Report

Introduction: Metastatic lesions of the oral cavity are extremely rare, accounting for approximately 1% of all malignant oral tumors. The most common primary sources of metastatic tumors in the oral region are, from the most to the least common, the breast, lung, kidney, bone, and colon. Renal cell carcinoma accounts for nearly 3% of all adult malignancies. It usually metastasizes to the lungs,...

متن کامل

Downregulation of TMEM40 by miR-138-5p suppresses cell proliferation and mobility in clear cell renal cell carcinoma

Background: Clear cell renal cell carcinoma (ccRCC) represents approximately 70% of RCC,as the most frequent histological subtype of RCC. MiR-138-5p, a tumor-related microRNA (miRNA), has been reported to be implicated in the diverse types of human malignancies, but its role in ccRCCremains unclear. Objective: The study was designed to investigate the function...

متن کامل

metastatic renal cell carcinoma presenting as a clear-cell tumor in tongue: a case report

introduction: metastatic lesions of the oral cavity are extremely rare, accounting for approximately 1% of all malignant oral tumors. the most common primary sources of metastatic tumors in the oral region are, from the most to the least common, the breast, lung, kidney, bone, and colon. renal cell carcinoma accounts for nearly 3% of all adult malignancies. it usually metastasizes to the lungs,...

متن کامل

Evaluation of Nuclear Morphometry and Ki-67 Index in Clear Cell Renal Cell Carcinomas: a Five‌-Year Study

Background and objective: Clear Cell Renal Cell Carcinoma (CCRCC) is the most common adult renal neoplasm. Staging and grading of RCC are important predictors of survival. Fuhrman nuclear grading is widely used for CCRCC, the subjective nature of which has prompted more objective methods to evaluate nuclear features. Furthermore, Ki-67, a reliable marker of cellular pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Experimental and Therapeutic Medicine

سال: 2013

ISSN: 1792-0981,1792-1015

DOI: 10.3892/etm.2013.1392