A Study on Change order factor analysis for military facility projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a study on thermodynamic models for simulation of 1,3 butadiene purification columns

attempts have been made to study the thermodynamic behavior of 1,3 butadiene purification columns with the aim of retrofitting those columns to more energy efficient separation schemes. 1,3 butadiene is purified in two columns in series through being separated from methyl acetylene and 1,2 butadiene in the first and second column respectively. comparisons have been made among different therm...

Factor Analysis of Risk Variables Affecting Occupational Injuries: A Field Study in Construction Projects

Background and Objective: Approximately, half of the occupational accidents are associated with the construction industry in Iran. Therefore, the factor analysis of risk variables affecting occupational injuries in the construction industry can lead to understanding and reducing the rate of injuries in these projects. The purpose of this study was to identify the risk factors affecting the type...

متن کامل

A Study on the Introduction of Wastewater Reuse Facility in Military Barracks by Cost-Benefit Analysis

The international society focuses on the environment protection and natural energy sources control for the global cooperation against weather change and sustainable growth. The study presents the overview of the water shortage status and the necessity of wastewater reuse facility in military facilities and for the possibility of the introduction, compares the economics by means of cost-benefit ...

متن کامل

INFORMATION STRUCTURE FOR INTEGRATION OF FACILITY PROJECTS AT OPERATIONAL AIRPORTS Facility projects at operational airports

Airport Organizations are faced with the increasingly complex task of integrating facility development projects with operational airport systems. Computer network systems present promising opportunities for meeting this challenge. The goal of improving the integration of airport systems is similar to the goal of computerintegrated construction in the Architectural, Engineering, Construction and...

متن کامل

developing a pattern based on speech acts and language functions for developing materials for the course “ the study of islamic texts translation”

هدف پژوهش حاضر ارائه ی الگویی بر اساس کنش گفتار و کارکرد زبان برای تدوین مطالب درس "بررسی آثار ترجمه شده ی اسلامی" می باشد. در الگوی جدید، جهت تدوین مطالب بهتر و جذاب تر، بر خلاف کتاب-های موجود، از مدل های سطوح گفتارِ آستین (1962)، گروه بندی عملکردهای گفتارِ سرل (1976) و کارکرد زبانیِ هالیدی (1978) بهره جسته شده است. برای این منظور، 57 آیه ی شریفه، به صورت تصادفی از بخش-های مختلف قرآن انتخاب گردید...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Korean Journal of Construction Engineering and Management

سال: 2016

ISSN: 2005-6095

DOI: 10.6106/kjcem.2016.17.2.127