A Study on Multi-object project scheduling utilizing GA
نویسندگان
چکیده
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملA Study on Multi Project Resource Constrained Project Scheduling using Metaheuristic Approach
Project management in the business field is defined as managing and directing time, material, personnel, and costs to complete a particular project. One important phase in the project planning is Project Resource Scheduling. This process identifies resources amount and type according to the activity that scheduled. Planning the efficient use of resources is a complex task. The purpose is to cre...
متن کاملProject Scheduling Based on Multi-Agent Systems
One of the most important and challenging issues in construction project management is to schedule activities to meet the construction project requirements under resource constraints. In this paper, we will concentrate on the development of a workflow scheduling system that can be applied in construction supply chains based on the interactions of entities/partners. Execution of workflows that h...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملA Project Scheduling Method Based on Fuzzy Theory
In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Management, JSCE
سال: 2003
ISSN: 1884-8311
DOI: 10.2208/procm.10.103