A Subtype of Severe Expressive Language Delay: Analysis of Speechless Children Using Acquisition Model of Expressive Language.

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Persian Adaptation of Enhanced Milieu Teaching for Iranian Children With Expressive Language Delay

Objectives: This study aimed at adapting and examining the applicability of the Teach-Model-Coach-Review model of the enhanced milieu teaching (EMT) approach for improving Iranian mothers’ language strategies while interacting with their toddlers with expressive language delay. Methods: In a single-subject multiple-baseline across-behavior study, the mothers of 3 toddlers with expressive langu...

متن کامل

Evaluate the Ability of Autistic Children to Use Expressive Language and Receptive Language

Introduction: In early typical language development, children understand words before they are able to use them in speech. Children with autism spectrum disorders (ASD) generally show impairments in both the comprehension and the production of language. However, the relative degree of delay or impairment in each of these sub-domains may also be atypical and remains less well-understood. Materia...

متن کامل

second language acquisition of telicity and aspect by persian learners of english

این تحقیق از دو قسمت اصلی تشکیل شده است: در قسمت اول فراگیری ختمیت به ویژه درک و تولید اینگونه جملات توسط فراگیران ایرانی زبان انگلیسی مورد بررسی قرار گرفته است. قضاوت تعدادی انگلیسی زبان بر روی این جملات نیز هدفی دیگر بود که در این رساله بررسی شده است. از موضوعات دیگر تفاوت بین نشانه های ختمیت در زبان انگلیسی و فارسی و تاثیر زبان اول فراگیران در درک و تولید اینگونه جملات است. در قسمت دوم استفا...

15 صفحه اول

critical period effects in foreign language learning:the influence of maturational state on the acquisition of reading,writing, and grammar in english as a foreign language

since the 1960s the age effects on learning both first and second language have been explored by many linguists and applied linguists (e.g lennerberg, 1967; schachter, 1996; long, 1990) and the existence of critical period for language acquisition was found to be a common ground of all these studies. in spite of some common findings, some issues about the impacts of age on acquiring a second or...

15 صفحه اول

the impact of training on second language writing assessment: a case of raters’ biasedness

چکیده هدف اول این تحقیق بررسی تأثیر آموزش مصحح بر آموزش گیرندگان براساس پایایی نمره های آنها در پنج بخش شامل محتوا ، سازمان ، لغت ، زبان و مکانیک بود. هدف دوم این بود که بدانیم آیا تفاوتهای بین آموزشی گیرندگان زن و مرد در پایایی نمرات آنها وجود دارد. برای بررسی این موارد ، ما 90 دانشجو در سطح میانه (متوسط) که از طریق تست تعیین سطح شده بودند انتخاب شدند. بعد از آنها خواستیم که درباره دو موضوع ا...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Japan Journal of Logopedics and Phoniatrics

سال: 1993

ISSN: 0030-2813,1884-3646

DOI: 10.5112/jjlp.34.354