A Two-Stage Interval-Stochastic Programming Model for Waste Management under Uncertainty

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty

In this study, a two-stage inexact-stochastic programming (TISP) method is developed for planning carbon dioxide (CO2) emission trading under uncertainty. The developed TISP incorporates techniques of interval-parameter programming (IPP) and two-stage stochastic programming (TSP) within a general optimization framework. The TISP can not only tackle uncertainties expressed as probabilistic distr...

متن کامل

A Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design

Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...

متن کامل

Reconfiguration of Supply Chain: A Two Stage Stochastic Programming

In this paper, we propose an extended relocation model for warehouses configuration in a supply chain network, in which uncertainty is associated to operational costs, production capacity and demands whereas, existing researches in this area are often restricted to deterministic environments. In real cases, we usually deal with stochastic parameters and this point justifies why the relocation m...

متن کامل

A Numerical Method for Two-Stage Stochastic Programs under Uncertainty

Motivated by problems coming from planning and operational management in power generation companies, this work extends the traditional two-stage linear stochastic program by adding probabilistic constraints in the second stage. In this work we describe, under special assumptions, how the two-stage stochastic programs with mixed probabilities can be treated computationally. We obtain a convex co...

متن کامل

An Optimization Model for Multi-objective Closed-loop Supply Chain Network under uncertainty: A Hybrid Fuzzy-stochastic Programming Method

In this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (CLSC) network. In order to make theresults of this article more realistic, a CLSC for a case study inthe iron and steel industry has been explored. The presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Air & Waste Management Association

سال: 2003

ISSN: 1096-2247,2162-2906

DOI: 10.1080/10473289.2003.10466195