Accelerated Particle Swarm Optimization to Solve Large-Scale Network Plan Optimization of Resource-Leveling with a Fixed Duration
نویسندگان
چکیده
منابع مشابه
Optimizing question answering systems by Accelerated Particle Swarm Optimization (APSO)
One of the most important research areas in natural language processing is Question Answering Systems (QASs). Existing search engines, with Google at the top, have many remarkable capabilities. But there is a basic limitation (search engines do not have deduction capability), a capability which a QAS is expected to have. In this perspective, a search engine may be viewed as a semi-mechanized QA...
متن کاملApplication of Particle Swarm Optimization and Genetic Algorithm Techniques to Solve Bi-level Congestion Pricing Problems
The solutions used to solve bi-level congestion pricing problems are usually based on heuristic network optimization methods which may not be able to find the best solution for these type of problems. The application of meta-heuristic methods can be seen as viable alternative solutions but so far, it has not received enough attention by researchers in this field. Therefore, the objective of thi...
متن کاملParticle Swarm Optimization with Scale-Free Interactions
The particle swarm optimization (PSO) algorithm, in which individuals collaborate with their interacted neighbors like bird flocking to search for the optima, has been successfully applied in a wide range of fields pertaining to searching and convergence. Here we employ the scale-free network to represent the inter-individual interactions in the population, named SF-PSO. In contrast to the trad...
متن کاملCAPSO: Centripetal accelerated particle swarm optimization
Meta-heuristic search algorithms are developed to solve optimization problems. Such algorithms are appropriate for global searches because of their global exploration and local exploitation abilities. Swarm intelligence (SI) algorithms comprise a branch of meta-heuristic algorithms that imitate the behavior of insects, birds, fishes, and other natural phenomena to find solutions for complex opt...
متن کاملElitist Vector Evaluated Particle Swarm Optimization for Multi - mode Resource Leveling Problems ⋆
This paper focuses on solving a typical multi-mode resource leveling problem, in which activity duration depends on committed resources, project deadlines and other constraints. To solve this problem, we establish a multi-objective model to minimize project duration, resource requirements and resource variance. Based on the established model, a novel Elitist Vector Evaluated Particle Swarm Opti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2018
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2018/9235346