Activity modes selection for project crashing through deterministic simulation
نویسندگان
چکیده
منابع مشابه
Evolutionary Algorithm for Solving Multi-Mode Resource Constrained Project Scheduling Problems through Deterministic Mode Selection
This work describes a novel approach towards solving Multimode Resource Constrained Project Scheduling (MRCPS) Problems and an algorithm developed to implement this approach. The algorithm is intended to be used as an alternative to the various genetic algorithms currently being used to solve such problems. Using a deterministic approach that aims to select the optimum modes for execution as ef...
متن کاملNature-inspired metaheuristics for multiobjective activity crashing
Many project tasks and manufacturing processes consist of interdependent timerelated activities that can be represented as networks. Deciding which of these subprocesses should receive extra resources to speed up the whole network (i. e., where activity crashing should be applied) usually involves the pursuit of multiple objectives amid a lack of a priori preference information. A common decisi...
متن کاملSupply Chain Coordination through Lead Time Crashing in a Socially Responsible Supply Chain Considering Transportation Modes and Carbon Emissions Tax
In this paper, a socially responsible supply chain consisting of one supplier and one retailer is proposed. The supplier decides on replenishment cycle multiplier and the retailer invests in corporate social responsibility (CSR) and decides on the order-up-to-level under a periodic review replenishment policy. The retailer’s decisions impact on the supplier’s probability as well as the supply c...
متن کاملA Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
Many applications such as project scheduling, workkow modeling, or business process re-engineering incorporate the common idea that a product, task, or service consisting of interdependent time{related activities should be produced or performed within given time limits. In real{life applications, certain measures like the use of additional manpower , the assignment of highly{skilled personnel t...
متن کاملAn Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial Engineering and Management
سال: 2011
ISSN: 2013-0953,2013-8423
DOI: 10.3926/jiem.224